Feature Improvements
The focus of this release is on adding data export capabilities and improving the application functions and behaviour. This includes:
- Multiple activity tags for a group are now stacked in the parking lot to conserve space. Click or touch on the stack to cycle through and find the activity to move to a lane.
- Add 'Export to PDF' button and function to the 'PPC and Variance' tab
- When an activity is selected, all logic and predecessor ties in a sequence will appear.
- A Power BI template has been created for more advanced analytics. Ensure you have Power BI Desktop installed before clicking on ‘Show analytics’.
- The Export tab in the Reports section has been re-designed for improved clarity.
- The ‘Schedule Milestone ID’ has been added to the Milestone if they are being imported or a reference is needed to a master plan.
- When the application is launched, a subscription and sign in is required. Contact us if you don’t have a subscription.
- The Design Planner user guide has been updated.
Fixes
- The text on the 'Reasons for variance' statusing dropdown has been returned to black.
- Statusing an activity as not done with a reason for variance as 'No approval' does not result in a zeros entry in the data export file.
- Conditions of satisfaction and milestone colour are now being exported in the data table.
- The reasons for variance colour is now being exported properly.